St. Aidan’s Park Road
St. Aidan’s Park Road, will be closed from its junction with Malahide Road to the junction with Haverty / Carleton Road from 20th September to 21st September 2010 from 08.00 hrs to 20.00 hrs (daily). This temporary road closure is to facilitate road resurfacing work.
Traffic Management Plan
Outbound traffic on Malahide Road wishing to turn left onto St Aidan’s Park Road, will be diverted left via Brian Road, and left onto Carleton Road
- Inbound traffic on Malahide Road wishing to turn right onto St. Aidan’s Park Road, will be diverted right via Brian Road and left onto Carleton Road
- Traffic in the Marino Area approaching the junction of Carleton Road/St Aidan’s Park Road will be diverted through Carleton Road.
Pedestrian and local access will be maintained at all times.
Market Street South / Bellevue, Dublin 8 Closures
Market Street South / Bellevue, Dublin 8 will be closed from its junction with Grand Canal place to Crane Street from 22nd – 24th September 2010 (entire period). The closure is to facilitate private event.
Traffic Management Plan
During the period of closure, the following diversion routes will apply:
- Eastbound traffic seeking to enter Market Street South will be diverted via Grand Canal Place, Bond Street, Robert Street, and South / Marrowbone Lane. There will be no through road from Market Street to School Street.
- Access to School Street will be via the aforementioned route.
- Local access will be provided to traffic and pedestrians with bona fide requirements only.
Grace Park Terrace
Grace Park Terrace, will be closed from Grace Park Road to Phillipsburgh Avenue from Wednesday 22nd September to Friday 24th September 2010 from 8am to 8pm daily. This temporary road closure is to facilitate road resurfacing work.
Traffic Management Plan
- Traffic on Grace Park Road wishing to travel east on Grace Park Terrace to Phillipsburgh Avenue will be diverted via Griffith Avenue.
- Traffic on Phillipsburgh Avenue wishing to travel west on Grace Park Terrace to Grace Park Road will be diverted via Griffith Avenue.
Pedestrian and local access to be maintained.
Santry Avenue
Santry Avenue will be closed between Ballymun Road and Swords Road on dates and times below:
Period 1: Monday 27th September to Thursday 30th September 2010
Period 2: Monday 4th October to Thursday 7th October 2010
Period 3: Monday 11th October to Wednesday 13th October 2010
Period 4: Friday 15th October to Sunday 17th October 2010
Times: 7.30 pm to 5.00 am daily.
The temporary road closure is to facilitate road resurfacing work.
Traffic Management Plan
- Inbound traffic on Ballymun Road wishing to turn left onto Santry Avenue, will be diverted via Collins Avenue extension, and left onto Swords Road
- Inbound traffic on Swords Road wishing to turn right onto Santry Avenue, will be diverted via Collins Avenue Extension and Ballymun Road
- Outbound traffic on Ballymun Road wishing to turn right onto Santry Avenue, will be diverted via Collins Avenue extension, and left onto Swords Road
- Outbound traffic on Swords Road wishing to turn left onto Santry Avenue will be diverted via Collins Avenue Extension and Ballymun Road
Pedestrian and local access will be maintained.