Samuel Beckett Bridge Openings
The Samuel Beckett Bridge links the Northside and Southside of the city over the River Liffey in the Dublin Docklands.
- Actual opening time is subject to approval by the Director of Traffic and the Gardai, and will depend on local events in the area.
- The scheduled dates will change if the bridge is opened to shipping traffic during the two weekly periods.
- Note that the bridge will be closed to vehicular and pedestrian traffic for the times specified.
Current Traffic Management Plans
Visit Samuel Beckett Bridge Schedule to see open and closing times for the bridge.
Construction commenced in May 2007 and the bridge opened to traffic on the 11th December 2009. The Beckett Brochure gives more information about this bridge.
For details of scheduled opening times (when the bridge is closed to pedestrian and vehicular traffic) see attached pdf document. The opening times schedule is also available in Irish.
Contact Details